Cement Plants

8 February، 2020

Repair lime stone Belt conveyor #17 – Length 300m – Suez Cement

SUEZ CEMENT PLANT Scope of Work: Executed manufacturing and installing mechanical, electrical and civil works for lime stone Belt conveyor  #17 with a length of 300 […]
8 February، 2020

Repair lime stone steel cord Belt conveyor – Length 500m – Kattamia Cement

SUEZ CEMENT – KATTAMIA PLANT Scope of Work: We executed an emergency repairs, mechanical and electrical installations and civil works for lime stone steel cord Belt […]
8 February، 2020

Upgrading Filter from E.p to Bag Filter – suez cement

SUEZ CEMENT PLANT Scope of Work: Dismantling the old E.P Filter, Pre-assembly for new Bag Filter, insulation of new bag filter & erection of the new […]
8 February، 2020

Change Cement Mill Section- Tourah Cement Plant

Tourah Cement Plant Scope of Work: Dismantle the old Section of C.M (40 ton) manually by Chain blocks due to shortages in area  for mobile crane […]
8 February، 2020

Exchange Cement Mill to Coal Mill – Tourah Cement

Tourah Cement Plant Scope of Work: Execution the civil works, Fabrication Steel works to convert the cement mill to coal mill  
8 February، 2020

Changing works of Pan Conveyor. No # 2 – Tourah Cement

TOURAH CEMENT PLANT Scope of work: Removal the old Pan Conveyor No.2 , adjusting the supports & rails, and install the new one    
8 February، 2020

Rehabilitation Symmetro C.M – Tourah Cement

TOURAH CEMENT PLANT Scope of Work: Rehabilitation of Symmetro cement mill at Tourah Cement Plant
8 February، 2020

Supply & Install Elevator Platforms – SUEZ CEMENT

SUEZ CEMENT PLANT Scope of Work:  fabrication, and install the beams Platform for all levels of Pre-heater Elevator tower
8 February، 2020

Upgrade Lime Stone Crusher – Kattamia Cement

SUEZ CEMENT – KATTAMIA CEMENT PLANT Scope of Work: Upgrade limestone crusher completely.
8 February، 2020

Supply& Install SS and ME of the AF system – HELWAN CEMENT

HELWAN CEMENT PLANT Scope Of Work: Fabrication, Erection the Steel Works Execution the Civil Works Installation the Piping of  A.F from Station to inlet Point on […]
8 February، 2020

Demolishing the lime factory – TOURAH CEMENT

TOURAH CEMENT PLANT Scope of Work: removal the all equipment, Belt Conveyors, Building (Steel Structure & Civil), & Electrical cables by using safe method during the […]
8 February، 2020

Demolishing the STACK – HELWAN CEMENT

HELWAN Cement Plant Scope of Work: Removal the stack from the top to ground.
8 February، 2020

Modification of chimney – TITAN CEMENT – BANI-SUiF

TITAN CEMENT – BANI-SUiF Plant Scope of Work: Removal the top part of Raw mill chimney  
8 February، 2020

Shut Down Pre-heater – TITAN CEMENT Bani-suif

TITIAN CEMENT – Bani-Suif Plant. Scope of Work: Change material pipes, Ex-joints, and Sheet metal works  
8 February، 2020

Changing 2 Tyre for Vertical Mill – ARISH CEMENT

ARISH CEMENT PLANT Scope of Work: Removal two old Tyre & erection new tyres  
8 February، 2020

Fabrication and installation RDF system – Helwan Cement

Helwan Cement plant Scope of work: Fabrication & Erection Steel Structure for Surface feeder building & Dosing Tower building Fabrication & erection the chutes Installation the […]
8 February، 2020

Fabrication and Erection Lime Stone Crusher – FLSmidth- Qumia Plant

FLSmidth operation – Qumia Cement Plant Scope of work : Remove the body of limestone crusher, Pan conveyor,inlet Chute, and rotor of crusher with motor Fabrication […]
6 February، 2020

Supply & Fabrication Main Condition Tower-HElwan Cement, El minya plant

HElwan Cement, El minya plant Scope of Work: Remove the old Condition tower & walkway, Fabrication new Condition tower & Erection it  
6 February، 2020

Supply and Fabrication filter ducts & fan casing- kattamia Cement plant

Kattamia Cement Plant Scope of Work: remove the old duct from fan to filter & fabrication new duct and erection under supervision from expert from FLSmidth
6 February، 2020

Supply & Install Pherro Sulphet silo 120m3 – Tourah Cement

Tourah Cement Plant Scope of Work:  Design, fabrication, and Install  Pherro Sulphet silo with volume 120 m3 with frame structure.